Projects ...      

 

 

 

 
FTCT, Classrooms, Shudy Camps, Cambridgeshire  

This building commissioned by Friends Therapeutic Community Trust
provides three classroom accommodation, study rooms and toilet facilities. It has been completed within 18 weeks schedule, adopting a modern energy and cost-efficient off-site construction method and finished in cedar cladding to blend in with the surrounding landscape.

Energy efficient glazing has been installed throughout. Timber has been specified from sustainable sources. The design maximises use of natural ventilation and daylight and incorporates high levels of insulation. It also features low-maintenance internal and external finishes.

 
   
Copyright 2000-2017 IVEL Consult